| TIP ID | Proponent(s) | Project Name | TOTAL SCORE  (out of 134)  | 
SAFETY (30 possible points)  | 
Crash Severity   Value: Equivalent Property Damage Only (EPDO) index (up to 5 points)  | 
Crash Severity   Rate: Equivalent Property Damage Only (EPDO) index per VMT  (up to 5 points)  | 
Improves   truck-related safety issue  (up to 5 points)  | 
Improves   bicycle safety  (up to 5 points)  | 
Improves   pedestrian safety  (up to 5 points)  | 
Improves safety   or removes an at-grade railroad crossing  (up to 5 points)  | 
SYSTEM   PRESERVATION  (29 possible points)  | 
Improves   substandard roadway bridge(s)  (up to 3 points)  | 
Improves   substandard pavement (up to 6 points)  | 
Improves   substandard traffic signal equipment (up to 6 points)  | 
Improves   transit asset(s)  (up to 3 points)  | 
Improves   substandard sidewalk(s)  (up to 3 points)  | 
Improves   emergency response  (up to 2 points)  | 
Improves   ability to respond to extreme conditions  (up to 6 points)  | 
CAPACITY   MANAGEMENT/MOBILITY (29 possible points)  | 
Reduces transit   vehicle delay  (up to 4 points)  | 
Improves   pedestrian network and ADA accessibility  (up to 5 points)  | 
Improves   bicycle network  (up to 4 points)  | 
Improves   intermodal accommodations/connections to transit  (up to 6 points)  | 
Improves truck   movement  (up to 4 points)  | 
Reduces vehicle   congestion  (up to 6 points)  | 
CLEAN AIR/CLEAN   COMMUNITIES (16 possible points)  | 
Reduces   CO2 (up to 5 points)  | 
Reduces other   transportation-related emissions (VOC, Nox, CO)  (up to 5 points)  | 
Addresses   environmental impacts  (up to 4 points)  | 
Is in an   EOEEA-certified "Green Community"  (up to 2 points)  | 
TRANSPORTATION   EQUITY  (12 possible points)  | 
Serves Title   VI/non-discrimination populations  (up to 12 points)  | 
ECONOMIC   VITALITY (18 possible points)  | 
Serves targeted   development site  (up to 6 points)  | 
Provides for   development consistent with the compact growth strategies of MetroFuture  (up to 5 points)  | 
Provides   multimodal access to an activity center (up to 4 points)  | 
Leverages other   investments (non-TIP funding)  (up to 3 points)  | 
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 607738 | Bedford | Minuteman Bikeway Extension, from Loomis Street to the Concord T.L. | 38 | 7 | 1 | 0 | 0 | 3 | 3 | 0 | 9 | 0 | 6 | 0 | 0 | 3 | 0 | 0 | 9 | 0 | 5 | 4 | 0 | 0 | 0 | 8 | 1 | 2 | 3 | 2 | 1 | 1 | 4 | 0 | 2 | 2 | 0 | 
| 608164 | Sudbury | Bruce Freeman Rail Trail, Phase 2D | 38 | 7 | 1 | 0 | 0 | 3 | 3 | 0 | 3 | 0 | 0 | 0 | 0 | 3 | 0 | 0 | 13 | 0 | 5 | 4 | 4 | 0 | 0 | 10 | 3 | 4 | 1 | 2 | 1 | 1 | 4 | 0 | 2 | 2 | 0 | 
| 608006 | Framingham (MassDOT) | Pedestrian Hybrid Beacon Installation at Route 9 and Maynard Road | 26 | 11 | 2 | 3 | 0 | 0 | 5 | 1 | 6 | 0 | 0 | 4 | 0 | 0 | 1 | 1 | 2 | 0 | 2 | 0 | 0 | 0 | 0 | 2 | 0 | 0 | 0 | 2 | 1 | 1 | 4 | 0 | 2 | 2 | 0 | 
BLUE font = newly evaluated project
RED font = change in score from last year
BOLD font = project is in the Long-Range Transportation Plan
| TIP ID | Proponent(s) | Project Name | TOTAL SCORE  (out of 134)  | 
SAFETY (30 possible points)  | 
Crash Severity   Value: Equivalent Property Damage Only (EPDO) index (up to 5 points)  | 
Crash Severity   Rate: Equivalent Property Damage Only (EPDO) index per VMT  (up to 5 points)  | 
Improves   truck-related safety issue  (up to 5 points)  | 
Improves bicycle   safety  (up to 5 points)  | 
Improves   pedestrian safety  (up to 5 points)  | 
Improves safety   or removes an at-grade railroad crossing  (up to 5 points)  | 
SYSTEM   PRESERVATION  (29 possible points)  | 
Improves   substandard roadway bridge(s)  (up to 3 points)  | 
Improves   substandard pavement (up to 6 points)  | 
Improves   substandard traffic signal equipment (up to 6 points)  | 
Improves transit   asset(s)  (up to 3 points)  | 
Improves   substandard sidewalk(s)  (up to 3 points)  | 
Improves   emergency response  (up to 2 points)  | 
Improves ability   to respond to extreme conditions  (up to 6 points)  | 
CAPACITY   MANAGEMENT/MOBILITY (29 possible points)  | 
Reduces transit   vehicle delay  (up to 4 points)  | 
Improves   pedestrian network and ADA accessibility  (up to 5 points)  | 
Improves bicycle   network  (up to 4 points)  | 
Improves   intermodal accommodations/connections to transit  (up to 6 points)  | 
Improves truck   movement  (up to 4 points)  | 
Reduces vehicle   congestion  (up to 6 points)  | 
CLEAN AIR/CLEAN   COMMUNITIES (16 possible points)  | 
Reduces   CO2 (up to 5 points)  | 
Reduces other   transportation-related emissions (VOC, Nox, CO)  (up to 5 points)  | 
Addresses   environmental impacts  (up to 4 points)  | 
Is in an   EOEEA-certified "Green Community"  (up to 2 points)  | 
TRANSPORTATION   EQUITY  (12 possible points)  | 
Serves Title   VI/non-discrimination populations  (up to 12 points)  | 
ECONOMIC   VITALITY (18 possible points)  | 
Serves targeted   development site  (up to 6 points)  | 
Provides for   development consistent with the compact growth strategies of MetroFuture  (up to 5 points)  | 
Provides   multimodal access to an activity center (up to 4 points)  | 
Leverages other   investments (non-TIP funding)  (up to 3 points)  | 
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 607777 | Watertown | Rehabilitation of Mount Auburn St. (Route 16) | 68 | 18 | 5 | 2 | 3 | 3 | 5 | 0 | 10 | 0 | 4 | 4 | 0 | 2 | 0 | 0 | 16 | 4 | 0 | 2 | 4 | 0 | 6 | 12 | 4 | 4 | 2 | 2 | 3 | 3 | 9 | 4 | 2 | 3 | 0 | 
| 608078 | Chelsea | Reconstruction of Broadway, from City Hall Ave to the Revere City Line | 61 | 17 | 5 | 5 | 0 | 3 | 4 | 0 | 10 | 0 | 4 | 4 | 0 | 2 | 0 | 0 | 5 | 0 | 0 | 1 | 4 | 0 | 0 | 8 | 2 | 3 | 1 | 2 | 12 | 12 | 9 | 4 | 2 | 3 | 0 | 
| 608348 | Beverly | Rehabilitation of Bridge St. | 59 | 12 | 3 | 2 | 2 | 3 | 2 | 0 | 13 | 0 | 6 | 4 | 0 | 3 | 0 | 0 | 13 | 1 | 0 | 2 | 4 | 0 | 6 | 9 | 3 | 3 | 1 | 2 | 4 | 4 | 8 | 4 | 1 | 3 | 0 | 
| 602310 | Danvers | Reconstruction on Collins St. | 50 | 9 | 2 | 2 | 1 | 2 | 2 | 0 | 12 | 0 | 6 | 6 | 0 | 0 | 0 | 0 | 12 | 0 | 4 | 1 | 2 | 1 | 4 | 8 | 2 | 2 | 2 | 2 | 2 | 2 | 7 | 3 | 2 | 2 | 0 | 
| 608275 | Malden | Lighting and Sidewalk Improvements on Exchange Street | 47 | 8 | 1 | 1 | 0 | 1 | 5 | 0 | 8 | 0 | 4 | 0 | 0 | 3 | 1 | 0 | 6 | 0 | 4 | 1 | 1 | 0 | 0 | 5 | 1 | 1 | 1 | 2 | 10 | 10 | 10 | 2 | 3 | 2 | 3 | 
| 601607 | Hull  | 
Reconstruction of Atlantic Ave. and related work | 44 | 11 | 1 | 1 | 1 | 4 | 4 | 0 | 13 | 0 | 6 | 0 | 0 | 3 | 2 | 2 | 8 | 0 | 4 | 1 | 2 | 1 | 0 | 6 | 1 | 1 | 4 | 0 | 2 | 2 | 4 | 0 | 2 | 2 | 0 | 
| 601704 | Newton | Reconstruction and signal improvements on Walnut St. | 42 | 10 | 3 | 2 | 1 | 2 | 2 | 0 | 12 | 0 | 6 | 4 | 0 | 2 | 0 | 0 | 7 | 0 | 0 | 1 | 6 | 0 | 0 | 4 | -1 | 1 | 2 | 2 | 0 | 0 | 9 | 4 | 2 | 3 | 0 | 
| 605743 | Ipswich | Resurfacing and related work on Central and South Main Sts. | 38 | 10 | 2 | 2 | 2 | 2 | 2 | 0 | 9 | 0 | 4 | 0 | 0 | 2 | 1 | 2 | 5 | 0 | 0 | 1 | 4 | 0 | 0 | 4 | 1 | 1 | 2 | 0 | 2 | 2 | 8 | 3 | 3 | 2 | 0 | 
| 608007 | Cohasset | Corridor Improvements and Related Work on Justice Cushing Highway (Route 3A), from Beechwood Street to the Scituate Town Line | 36 | 15 | 4 | 2 | 3 | 3 | 3 | 0 | 7 | 0 | 0 | 4 | 0 | 3 | 0 | 0 | 6 | 0 | 4 | 1 | 0 | 1 | 0 | 5 | 1 | 1 | 1 | 2 | 0 | 0 | 3 | 0 | 1 | 2 | 0 | 
| 604735 | Medfield | Reconstruction of North St. | 29 | 7 | 1 | 1 | 0 | 3 | 2 | 0 | 8 | 0 | 4 | 0 | 0 | 3 | 1 | 0 | 2 | 0 | 0 | 1 | 0 | 1 | 0 | 4 | 1 | 1 | 2 | 0 | 1 | 1 | 7 | 3 | 2 | 2 | 0 | 
| 604745 | Wrentham | Reconstruction of Taunton St. (Route 152) | 29 | 8 | 1 | 1 | 1 | 2 | 3 | 0 | 7 | 0 | 6 | 0 | 0 | 0 | 1 | 0 | 5 | 0 | 4 | 1 | 0 | 0 | 0 | 4 | 1 | 1 | 2 | 0 | 1 | 1 | 4 | 0 | 2 | 2 | 0 | 
| 607899 | Dedham | Pedestrian improvements along Bussey St. | 25 | 7 | 2 | 2 | 0 | 1 | 2 | 0 | 3 | 0 | 0 | 0 | 0 | 3 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 | 0 | 4 | 1 | 1 | 0 | 2 | 7 | 7 | 3 | 0 | 2 | 1 | 0 | 
BLUE font = newly evaluated project
RED font = change in score from last year
BOLD font = project is in the Long-Range Transportation Plan
| TIP ID | Proponent(s) | Project Name | TOTAL SCORE  (out of 134)  | 
SAFETY (30 possible points)  | 
Crash Severity   Value: Equivalent Property Damage Only (EPDO) index (up to 5 points)  | 
Crash Severity   Rate: Equivalent Property Damage Only (EPDO) index per VMT  (up to 5 points)  | 
Improves   truck-related safety issue  (up to 5 points)  | 
Improves bicycle   safety  (up to 5 points)  | 
Improves   pedestrian safety  (up to 5 points)  | 
Improves safety   or removes an at-grade railroad crossing  (up to 5 points)  | 
SYSTEM   PRESERVATION  (29 possible points)  | 
Improves   substandard roadway bridge(s)  (up to 3 points)  | 
Improves   substandard pavement (up to 6 points)  | 
Improves   substandard traffic signal equipment (up to 6 points)  | 
Improves transit   asset(s)  (up to 3 points)  | 
Improves   substandard sidewalk(s)  (up to 3 points)  | 
Improves   emergency response  (up to 2 points)  | 
Improves ability   to respond to extreme conditions  (up to 6 points)  | 
CAPACITY   MANAGEMENT/MOBILITY (29 possible points)  | 
Reduces transit   vehicle delay  (up to 4 points)  | 
Improves   pedestrian network and ADA accessibility  (up to 5 points)  | 
Improves bicycle   network  (up to 4 points)  | 
Improves   intermodal accommodations/connections to transit  (up to 6 points)  | 
Improves truck   movement  (up to 4 points)  | 
Reduces vehicle   congestion  (up to 6 points)  | 
CLEAN AIR/CLEAN   COMMUNITIES (16 possible points)  | 
Reduces   CO2 (up to 5 points)  | 
Reduces other   transportation-related emissions (VOC, Nox, CO)  (up to 5 points)  | 
Addresses   environmental impacts  (up to 4 points)  | 
Is in an   EOEEA-certified "Green Community"  (up to 2 points)  | 
TRANSPORTATION   EQUITY  (12 possible points)  | 
Serves Title   VI/non-discrimination populations  (up to 12 points)  | 
ECONOMIC   VITALITY (18 possible points)  | 
Serves targeted   development site  (up to 6 points)  | 
Provides for   development consistent with the compact growth strategies of MetroFuture  (up to 5 points)  | 
Provides   multimodal access to an activity center (up to 4 points)  | 
Leverages other   investments (non-TIP funding)  (up to 3 points)  | 
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 606130 | Norwood | Intersection improvements at Route 1A and Upland Rd./Washington St. and Prospect St./Fulton St. | 47 | 13 | 1 | 2 | 4 | 2 | 4 | 0 | 7 | 0 | 6 | 0 | 0 | 0 | 1 | 0 | 14 | 1 | 4 | 1 | 4 | 2 | 2 | 3 | 1 | 1 | 1 | 0 | 3 | 3 | 7 | 3 | 1 | 3 | 0 | 
| 608229 | Acton | Intersection Improvements at Massachusetts Avenue (Route 111) and Main Street (Route 27) (Kelly's Corner) | 45 | 15 | 3 | 4 | 2 | 3 | 3 | 0 | 8 | 0 | 0 | 4 | 0 | 3 | 1 | 0 | 10 | 0 | 4 | 1 | 0 | 1 | 4 | 8 | 2 | 1 | 3 | 2 | 0 | 0 | 4 | 0 | 2 | 2 | 0 | 
| 604231 | Marlborough | Intersection and signal improvements on Route 20 (East Main St./Boston Post Rd.) at Concord Rd. | 39 | 6 | 2 | 2 | 0 | 0 | 2 | 0 | 12 | 0 | 4 | 6 | 0 | 2 | 0 | 0 | 6 | 1 | 0 | 0 | 0 | 1 | 4 | 7 | 2 | 2 | 1 | 2 | 3 | 3 | 5 | 3 | 1 | 1 | 0 | 
| 607249 | Sudbury (MassDOT) | Intersection improvements at Route 20 and Landham Rd. | 37 | 16 | 2 | 5 | 3 | 3 | 3 | 0 | 7 | 0 | 4 | 0 | 0 | 3 | 0 | 0 | 4 | 0 | 0 | 1 | 0 | 1 | 2 | 5 | 1 | 1 | 1 | 2 | 0 | 0 | 5 | 3 | 0 | 2 | 0 | 
| 608146 | Marblehead | Intersection improvements to Pleasant St. at Village/Vine/Cross Sts. | 36 | 8 | 1 | 1 | 0 | 3 | 3 | 0 | 10 | 0 | 6 | 0 | 0 | 3 | 0 | 1 | 5 | 0 | 0 | 1 | 4 | 0 | 0 | 3 | 1 | 1 | 1 | 0 | 1 | 1 | 9 | 4 | 2 | 3 | 0 | 
| 606002 | Duxbury | Signal installation at Route 3 (NB and SB) ramps and Route 3A (Tremont St.) | 33 | 6 | 2 | 1 | 1 | 0 | 2 | 0 | 11 | 0 | 4 | 6 | 0 | 0 | 1 | 0 | 10 | 0 | 4 | 0 | 0 | 2 | 4 | 4 | 2 | 2 | 0 | 0 | 0 | 0 | 2 | 0 | 1 | 1 | 0 | 
BLUE font = newly evaluated project
RED font = change in score from last year
BOLD font = project is in the Long-Range Transportation Plan
| TIP ID | Proponent(s) | Project Name | TOTAL SCORE  (out of 134)  | 
SAFETY (30 possible points)  | 
Crash Severity   Value: Equivalent Property Damage Only (EPDO) index (up to 5 points)  | 
Crash Severity   Rate: Equivalent Property Damage Only (EPDO) index per VMT  (up to 5 points)  | 
Improves   truck-related safety issue  (up to 5 points)  | 
Improves bicycle   safety  (up to 5 points)  | 
Improves   pedestrian safety  (up to 5 points)  | 
Improves safety   or removes an at-grade railroad crossing  (up to 5 points)  | 
SYSTEM   PRESERVATION  (29 possible points)  | 
Improves   substandard roadway bridge(s)  (up to 3 points)  | 
Improves   substandard pavement (up to 6 points)  | 
Improves   substandard traffic signal equipment (up to 6 points)  | 
Improves transit   asset(s)  (up to 3 points)  | 
Improves   substandard sidewalk(s)  (up to 3 points)  | 
Improves   emergency response  (up to 2 points)  | 
Improves ability   to respond to extreme conditions  (up to 6 points)  | 
CAPACITY   MANAGEMENT/MOBILITY (29 possible points)  | 
Reduces transit   vehicle delay  (up to 4 points)  | 
Improves   pedestrian network and ADA accessibility  (up to 5 points)  | 
Improves bicycle   network  (up to 4 points)  | 
Improves   intermodal accommodations/connections to transit  (up to 6 points)  | 
Improves truck   movement  (up to 4 points)  | 
Reduces vehicle   congestion  (up to 6 points)  | 
CLEAN AIR/CLEAN   COMMUNITIES (16 possible points)  | 
Reduces   CO2 (up to 5 points)  | 
Reduces other   transportation-related emissions (VOC, Nox, CO)  (up to 5 points)  | 
Addresses   environmental impacts  (up to 4 points)  | 
Is in an   EOEEA-certified "Green Community"  (up to 2 points)  | 
TRANSPORTATION   EQUITY  (12 possible points)  | 
Serves Title   VI/non-discrimination populations  (up to 12 points)  | 
ECONOMIC   VITALITY (18 possible points)  | 
Serves targeted   development site  (up to 6 points)  | 
Provides for   development consistent with the compact growth strategies of MetroFuture  (up to 5 points)  | 
Provides   multimodal access to an activity center (up to 4 points)  | 
Leverages other   investments (non-TIP funding)  (up to 3 points)  | 
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 607981 | Somerville | McGrath Boulevard project | 68 | 13 | 3 | 2 | 0 | 4 | 4 | 0 | 14 | 0 | 6 | 6 | 0 | 2 | 0 | 0 | 11 | 0 | 0 | 1 | 6 | 0 | 4 | 8 | 3 | 3 | 0 | 2 | 10 | 10 | 12 | 4 | 5 | 3 | 0 | 
| 608449 | Boston | Commonwealth Avenue, phases 3 and 4 | 67 | 17 | 3 | 2 | 0 | 5 | 4 | 3 | 12 | 0 | 4 | 4 | 0 | 2 | 2 | 0 | 11 | 0 | 0 | 4 | 6 | 1 | 0 | 8 | 2 | 3 | 1 | 2 | 8 | 8 | 11 | 4 | 4 | 3 | 0 | 
| 60531 | Natick (MassDOT) | Bridge replacement, Route 27 (North Main St.) over Route 9 (Worcester St.) | 53 | 18 | 5 | 3 | 3 | 3 | 4 | 0 | 16 | 3 | 6 | 6 | 0 | 0 | 0 | 1 | 10 | 0 | 4 | 1 | 4 | 1 | 0 | 2 | -1 | -1 | 2 | 2 | 1 | 1 | 6 | 0 | 3 | 3 | 0 | 
| 601513 | Saugus (MassDOT) | Interchange reconstruction at Walnut St. and Route 1 (phase II) | 42 | 9 | 3 | 1 | 0 | 2 | 3 | 0 | 13 | 0 | 6 | 6 | 0 | 0 | 1 | 0 | 9 | 1 | 4 | 1 | 0 | 1 | 2 | 6 | 1 | 1 | 2 | 2 | 1 | 1 | 4 | 0 | 1 | 3 | 0 | 
| 603739 | Wrentham | Construction of I-495/Route 1A ramps | 35 | 9 | 2 | 2 | 5 | 0 | 0 | 0 | 8 | 0 | 4 | 4 | 0 | 0 | 0 | 0 | 8 | 0 | 0 | 0 | 0 | 2 | 6 | 10 | 5 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 
| 607305 | Reading (MassDOT) | Intersection Signalization at Route 28 & Hopkins Street | 34 | 6 | 1 | 1 | 0 | 0 | 4 | 0 | 12 | 0 | 4 | 4 | 0 | 2 | 1 | 1 | 5 | 0 | 2 | 0 | 0 | 1 | 2 | 2 | 1 | 1 | 0 | 0 | 2 | 2 | 7 | 2 | 3 | 2 | 0 | 
| 604638 | Peabody (MassDOT) | Mainline improvements on Route 128 (phase II) | 34 | 10 | 5 | 1 | 4 | 0 | 0 | 0 | 10 | 3 | 6 | 0 | 0 | 0 | 1 | 0 | 5 | 1 | 0 | 0 | 0 | 2 | 2 | 3 | 1 | 1 | 1 | 0 | 3 | 3 | 3 | 1 | 1 | 1 | 0 | 
BLUE font = newly evaluated project
RED font = change in score from last year
BOLD font = project is in the Long-Range Transportation Plan