WORK PROGRAM
Route 1 corridor study—dedham
May 28, 2020
The Boston Region Metropolitan Planning Organization (MPO) votes to approve this work program.
Agency and Other Client Transportation Planning Studies and Technical Analyses
Town of Dedham
Client Supervisor: Jeremy Rosenberger
Principal: Mark Abbott
Manager: Seth Asante
Town of Dedham
Schedule and budget details are shown in Exhibits 1 and 2, respectively.
This studyis supported in full with non-MPO funding. Committing MPO staff to this project will not impinge on the quality or timeliness of MPO-funded work.
The town of Dedham has been awarded a grant by the Massachusetts Office of Travel and Tourism to fund a study of the Route 1 (VFW Parkway and Providence Highway) in West Roxbury, Boston, and Dedham. The study area for this corridor study is Route 1 from the intersection of Route 109/Spring Street and VFW Parkway in Boston to the Marine Rotary at Washington Street in Dedham. This section of Route 1 was designed primarily as a relatively high-speed vehicle corridor. The existing development, future potential development, and redevelopment adjacent to the corridor requires a relook at the corridor’s design to address multimodal transportation and safety needs.
A roadway corridor study is a logical way to address regional multimodal transportation and safety needs since it evaluates a roadway corridor or arterial segment comprehensively, considering the goals of the community, needs of pedestrians, bicyclists, motorists, public transportation users, and roadway abutters. An additional key aspect to conducting a study of the corridor is public involvement; getting public input is essential in developing successful improvements. This study uses this approach to analyze the issues.
Central Transportation Planning Staff (CTPS) will develop short- and long-term recommendations for improvements within the roadway’s right-of-way. The intent is to improve the roadway corridor so that it is safe for people to access shops, schools, transit stations, and recreational areas, support existing and future development, and help the community meet its broader transportation and growth goals.
For this work program, CTPS will perform the following tasks:
CTPS and Metropolitan Area Planning Council (MAPC) staff, the Town of Dedham, and the City of Boston will establish an advisory committee composed of municipal officials, adjacent property owners, and others (to be identified). The Advisory Committee will include representatives from the Massachusetts Department of Transportation (MassDOT) Highway Division, the Department of Conservation and Recreation (DCR), the Army Corp of Engineers, the City of Boston, and the Massachusetts Bay Transportation Authority (MBTA). These stakeholders will advise CTPS about the study areas and data sources; help identify transportation-related problems; and help develop multimodal transportation solutions and recommendations. Either the Town of Dedham or other entities mentioned previously will implement the recommendations from this study; therefore, it is important that these recommendations reflect those entities’ experiences, and align with MassDOT design standards.
Task 2 consists of collecting and gathering data for evaluating existing conditions and conducting analysis for identifying problems and needs of the corridor.
CTPS will work with the Advisory Committee and stakeholders to identify relevant data sources, review base materials and previous studies to identify problems and needs, relevant data for analyses, missing data that needs to be collected, and findings and recommendations that need to be considered in the current study. Once the problem locations and gaps in data have been identified, CTPS will gather recent and historical data from existing sources, including databases maintained by the Town of Dedham, City of Boston, MPO, MassDOT Highway Division, MAPC, and the MBTA.
The relevant data will be pulled from existing databases for planning and evaluating roadway improvements such as crashes, traffic volumes, pedestrian and bicycle volumes, transit service data (ridership, boardings/alightings, average delays, etc.), traffic signal control and timing permits, pavement conditions, roadway inventory data, street lighting, and utilities within the right-of-way. Some data that will need to be collected in the field include the following:
The analysis performed in this study will be guided by the vision, goals, and principles identified by the Advisory Committee. Staff will perform the following tasks based on analyses conducted in similar past corridor studies:
Based on the results of the analyses described above ideas and feedback from the survey, and in consultation with Advisory Committee, CTPS will develop and recommend improvements as follows:
CTPS will submit a draft report on the background of the study, agency and municipal input, identification of problems, data collection, analyses, and recommendations. The document will follow MassDOT Highway Division’s guidelines for preparation of functional design reports as much as possible, taking into consideration the study’s budget.
After receiving comments on the draft report from municipal officials, MassDOT, and other study advisory groups, staff will address these comments and finalize the study report and recommendations.
The Boston Region Metropolitan Planning Organization (MPO) operates its programs, services, and activities in compliance with federal nondiscrimination laws including Title VI of the Civil Rights Act of 1964 (Title VI), the Civil Rights Restoration Act of 1987, and related statutes and regulations. Title VI prohibits discrimination in federally assisted programs and requires that no person in the United States of America shall, on the grounds of race, color, or national origin (including limited English proficiency), be excluded from participation in, denied the benefits of, or be otherwise subjected to discrimination under any program or activity that receives federal assistance. Related federal nondiscrimination laws administered by the Federal Highway Administration, Federal Transit Administration, or both, prohibit discrimination on the basis of age, sex, and disability. The Boston Region MPO considers these protected populations in its Title VI Programs, consistent with federal interpretation and administration. In addition, the Boston Region MPO provides meaningful access to its programs, services, and activities to individuals with limited English proficiency, in compliance with U.S. Department of Transportation policy and guidance on federal Executive Order 13166. The Boston Region MPO also complies with the Massachusetts Public Accommodation Law, M.G.L. c 272 sections 92a, 98, 98a, which prohibits making any distinction, discrimination, or restriction in admission to, or treatment in a place of public accommodation based on race, color, religious creed, national origin, sex, sexual orientation, disability, or ancestry. Likewise, the Boston Region MPO complies with the Governor's Executive Order 526, section 4, which requires that all programs, activities, and services provided, performed, licensed, chartered, funded, regulated, or contracted for by the state shall be conducted without unlawful discrimination based on race, color, age, gender, ethnicity, sexual orientation, gender identity or expression, religion, creed, ancestry, national origin, disability, veteran's status (including Vietnam-era veterans), or background. A complaint form and additional information can be obtained by contacting the MPO or at http://www.bostonmpo.org/mpo_non_discrimination. To request this information in a different language or in an accessible format, please contact Title VI Specialist |
Task |
Month | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | |
1.
Establish an Advisory Committee |
From Month 1, Week 1 to Month 2, Week 2.
|
|||||||||||
2.
Technical Analysis |
From Month 1, Week 1 to Month 5, Week 4.
|
|||||||||||
3.
Recommend Improvements and Conceptual Design |
From Month 4, Week 1 to Month 12, Week 4.
|
|||||||||||
4.
Document Results |
From Month 8, Week 1 to Month 12, Week 4.
|
Task |
Person-Weeks | Direct Salary |
Overhead (106.5%) |
Total Cost |
||||
---|---|---|---|---|---|---|---|---|
M-1 | P-5 | P-4 | P-2 | Total | ||||
1.
Establish an Advisory Committee
|
1.0 | 1.0 | 1.0 | 1.0 | 4.0 | $6,408 | $6,824 | $13,232 |
2.
Technical Analysis
|
2.0 | 5.0 | 3.0 | 5.5 | 15.5 | $24,125 | $25,693 | $49,818 |
3.
Recommend Improvements and Conceptual Design
|
1.0 | 4.0 | 2.0 | 2.5 | 9.5 | $15,487 | $16,493 | $31,980 |
4.
Document Results
|
2.0 | 3.0 | 1.0 | 1.0 | 7.0 | $12,240 | $13,036 | $25,276 |
Total
|
6.0 | 13.0 | 7.0 | 10.0 | 36.0 | $58,260 | $62,046 | $120,306 |