FFYs 2025-29 Final Scenario

Project Name MPO Score Investment Category MAPC
Subregion
FFY 2024–28 Programmed Year(s) FFY 2025–29
Programmed Year(s)
Design Status FFY 2025 (New) FFY 2026 (New) FFY 2027 (New) FFY 2028 (New) FFY 2029
(New)
Other Non-Target Funds Adjusted TFPC
 (FFYs 2025-29)
BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 64.6 BP ICC 2026 2027 25% Received $0 $8,000,000 $12,499,750 $0 $0 $0 $20,499,750
MALDEN- SPOT POND BROOK GREENWAY 73 BP ICC 2027 2028 Approved $0 $0 $0 $4,858,127 $0 $0 $4,858,127
COCHITUATE RAIL TRAIL EXTENSION (MBTA STATION TO MECHANIC STREET) - NATICK CENTER CONNECTION 67 BP MWRC 2028 2028 25% Received $0 $0 $0 $7,492,849 $0 $0 $7,492,849
SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 66.4 BP NSTF 2028 2028 Approved $0 $0 $0 $8,624,000 $0 $0 $8,624,000
SUDBURY-FRAMINGHAM- BIKE PATH CONSTRUCTION OF BRUCE FREEMAN RAIL TRAIL, FROM THE SUDBURY DIAMOND RAILROAD CROSSING TO EATON ROAD WEST 47 BP MAGIC N/A 2029 Approved $0 $0 $0 $0 $4,263,000 $0 $8,526,000
NEWMO MICROTRANSIT SERVICE EXPANSION 87 CC ICC 2023-25 2023-24 N/A $0 $0 $0 $0 $0 $0 $477,909
BIKESHARE STATE OF GOOD REPAIR SET-ASIDE N/A CC REGIONWIDE 2025-28 2026-29 Administrative $0 $1,000,000 $2,000,000 $2,000,000 $2,000,000 $0 $7,000,000
COMMUNITY CONNECTIONS PROGRAM N/A CC REGIONWIDE 2025-28 2026-29 Administrative $0 $1,887,222 $2,036,193 $2,000,000 $2,500,000 $0 $8,423,415
HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD.   55 CS SSC 2025 2026 25% DPH $0 $28,738,432 $0 $0 $0 $0 $28,738,432
BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET 58 CS ICC 2025 2026 25% Received R1 $0 $8,665,052 $0 $0 $0 $0 $8,665,052
EVERETT- RECONSTRUCTION OF BEACHAM STREET 54 CS ICC 2025 2027 Approved $0 $0 $10,954,656 $0 $0 $0 $10,954,656
ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 38 CS MWRC 2025 2028 25% Comments $0 $0 $0 $836,339 $0 $480,000 $1,316,340
LYNN- REHABILITATION OF ESSEX STREET 66 CS ICC 2025 2026-27 Approved $0 $10,000,000 $9,698,640 $0 $0 $0 $19,698,640
MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 43 CS SWAP 2026 2026 25% Received
R2
$0 $13,548,565 $0 $0 $0 $0 $13,548,565
BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA 53.2 CS ICC 2026 2027 Approved $0 $0 $16,632,000 $0 $0 $0 $16,632,000
SALEM- PEABODY- BOSTON STREET IMPROVEMENTS 68 CS NSTF 2026 2027 75% Received $0 $0 $26,122,722 $0 $0 $0 $26,122,722
WESTON- RECONSTRUCTION ON ROUTE 30 49.2 CS MWRC 2026 2027 25% DPH $0 $0 $19,999,712 $0 $0 $0 $19,999,712
WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET AND MONTVALE AVENUE 75 CS NSPC 2026 2029 Approved $0 $0 $0 $0 $9,335,200 $0 $18,670,200
CHELSEA- PARK STREET & PEARL STREET RECONSTRUCTION 69.9 CS ICC 2027 2027 Approved $0 $0 $11,287,647 $0 $0 $0 $11,705,708
BROOKLINE- REHABILITATION OF WASHINGTON STREET 62.4 CS ICC 2027 2028 Approved $0 $0 $0 $10,000,000 $18,995,267 $0 $28,995,267
WAKEFIELD- COMPREHENSIVE DOWNTOWN TRANSPORTATION IMPROVEMENT PROJECT 61.8 CS NSPC 2028 2028 Approved $0 $0 $0 $18,435,976 $0 $0 $18,435,976
WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE, INCLUDING REHAB OF N-25-032=W-31-018 53.3 CS TRIC 2028 2028 25% Received $0 $0 $0 $12,854,847 $10,000,000 $0 $22,854,847
IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS 47 CS NSTF 2026-27 2027-28 25% Received R1 $0 $0 $6,000,000 $5,728,698 $0 $0 $11,728,698
LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 74.9 CS ICC 2027-30 2028-31 Approved $0 $0 $0 $15,000,000 $20,000,000 $0 $45,897,600
BELLINGHAM- ROADWAY REHABILITATION OF ROUTE 126 (HARTFORD ROAD), FROM 800 NORTH OF THE I-495 NB OFF RAMP TO MEDWAY TL, INCLUDING B-06-017 54.3 CS SWAP N/A 2028 Approved $0 $0 $0 $0 $8,340,000 $0 $16,680,000
IPSWICH- ARGILLA ROAD ROADWAY RECONSTRUCTION 37.9 CS NSTF N/A 2029 Approved $0 $0 $0 $0 $3,000,000 $0 $5,368,966
CHELSEA- TARGETED SAFETY IMPROVEMENTS AND RELATED WORK ON BROADWAY, FROM WILLIAMS STREET TO CITY HALL AVENUE 83 II ICC 2025 2026 75% Received $0 $9,807,515 $0 $0 $0 $0 $9,807,515
WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET  50.6 II MWRC 2026 2026 75% Received $0 $3,237,804 $0 $0 $0 $0 $3,237,804
EVERETT- TARGETED MULTI-MODAL AND SAFETY IMPROVEMENTS ON ROUTE 16 N/A II ICC 2027 N/A Approved $0 $0 $0 $0 $0 $0 $5,059,530
NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  55 II TRIC 2026-27 2026-27 25% Received R1 $0 $27,636,336 $0 $0 $0 $0 $27,636,336
QUINCY- INTERSECTION IMPROVEMENTS AT WILLARD STREET AND RICCIUTI DRIVE 41.1 II ICC N/A 2026 75% Received $0 $1,885,353 $0 $0 $0 $0 $1,885,353
SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 72.2 MI ICC 2027-30 2027-31 Approved $0 $0 $30,000,000 $30,000,000 $30,310,000 $0 $88,250,000
BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 59 MI ICC 2027-32 2028-32 25% Received R1 $0 $0 $0 $33,500,000 $45,000,000 $0 $197,759,449
LEXINGTON- DESIGN OF SAFETY IMPROVEMENTS AT THE INTERSTATE 95 AND ROUTE 4/225 INTERCHANGE TBD MI MAGIC N/A 2026 N/A $0 $1,650,000 $0 $0 $0 $0 $1,650,000
FRAMINGHAM- PRELIMINARY DESIGN OF INTERSECTION IMPROVEMENTS AT ROUTE 126/135/MBTA & CSX RAILROAD TBD MI MWRC N/A 2026 N/A $0 $1,400,000 $0 $0 $0 $0 $1,400,000
PROJECT DESIGN SUPPORT PILOT N/A N/A REGIONWIDE 2025 2025 Administrative $0 $0 $0 $0 $0 $0 $0
TRANSIT TRANSFORMATION PROGRAM N/A TT REGIONWIDE 2025-28 2026-29 Administrative $0 $5,000,000 $6,500,000 $6,500,000 $6,500,000 $0 $24,500,000
SCITUATE- INSTALLATION OF 25 BICYCLE RACKS 45.5 CC SSC N/A 2025 N/A $22,800 $0 $0 $0 $0 $0 $22,800
CATA - FARE UPGRADES FOR ADA AND DIAL-A-RIDE CUSTOMERS TBD TT NSTF N/A 2025 N/A $65,000 $0 $0 $0 $0 $0 $65,000
MALDEN- CANAL STREET BICYCLE LANES 51.25 CC ICC N/A 2025 N/A $81,250 $0 $0 $0 $0 $0 $81,250
ARLINGTON- INSTALLATION OF 123 BICYCLE RACKS AND RELATED MATERIALS 74.5 CC ICC N/A 2025 N/A $90,878 $0 $0 $0 $0 $0 $90,878
MWRTA CATCHCONNECT MICROTRANSIT SERVICE EXPANSION – HUDSON AND MARLBOROUGH 59 CC MWRC 2023-25 2023-25 N/A $159,488 $0 $0 $0 $0 $0 $308,913
MWRTA CATCHCONNECT MICTROTRANSIT EXPANSION PHASE 2 – FRAMINGHAM AND NATICK EXTENDED HOURS 90 CC MWRC 2024-26 2024-26 N/A $165,625 $162,500 $0 $0 $0 $0 $380,477
REVERE- BLUEBIKES EXPANSION TO NORTHERN STRAND (SALEM STREET AT NORTH MARSHALL STREET) AND GRISWOLD PARK  63.5 CC ICC N/A 2025 N/A $169,000 $0 $0 $0 $0 $0 $169,000
BROOKLINE- BLUEBIKES STATE OF GOOD REPAIR, 3 STATIONS AND 62 PEDAL BIKES 67 CC ICC N/A 2025 N/A $200,000 $0 $0 $0 $0 $0 $200,000
STONEHAM SHUTTLE SERVICE 72 CC NSPC 2023-25 2023-25 N/A $205,189 $0 $0 $0 $0 $0 $466,628
CATA ON DEMAND MICROTRANSIT SERVICE EXPANSION – ROCKPORT AND LANESVILLE 61.75 CC NSTF 2023-25 2023-25 N/A $214,776 $0 $0 $0 $0 $0 $214,776
PLEASANT STREET SHUTTLE SERVICE EXPANSION 78 CC ICC 2023-25 2023-25 N/A $228,939 $0 $0 $0 $0 $0 $564,373
HOLLISTON- INTERSECTION IMPROVEMENTS AT ROUTE 16 AND WHITNEY STREET [DESIGN ONLY] 42.8 II MWRC N/A 2025 Initiated $250,000 $0 $0 $0 $0 $0 $250,000
SOMERVILLE- BLUEBIKES STATE OF GOOD REPAIR, 13 STATIONS 67.5 CC ICC N/A 2025 N/A $278,127 $0 $0 $0 $0 $0 $278,127
BOSTON- REPURPOSING SINGLE SPACE PARKING METER POLES FOR 1600 BICYCLE RACKS 82 CC ICC N/A 2025 N/A $379,470 $0 $0 $0 $0 $0 $379,470
CAMBRIDGE- BLUEBIKES STATE OF GOOD REPAIR, 8 STATIONS AND 65 PEDAL BIKES 68.5 CC ICC N/A 2025 N/A $385,456 $0 $0 $0 $0 $0 $385,456
MONTACHUSETT RTA MICROTRANSIT SERVICE 57 CC MAGIC 2023-25 2023-25 N/A $406,641 $0 $0 $0 $0 $0 $836,995
CHELSEA-REVERE- REGIONAL ON DEMAND MICROTRANSIT PILOT PROJECT 53.75 CC ICC N/A 2025-27 N/A $499,649 $450,278 $463,807 $0 $0 $0 $1,413,375
BOSTON- BLUEBIKES STATION REPLACEMENT AND ELECTRIFICATION, 12 STATIONS 76.5 CC ICC N/A 2025 N/A $590,348 $0 $0 $0 $0 $0 $590,348
FRAMINGHAM- CHRIS WALSH TRAIL PHASE 2 [DESIGN ONLY] 79.9 BP MWRC N/A 2025 Initiated $850,000 $0 $0 $0 $0 $0 $850,000
SHERBORN- RECONSTRUCTION OF ROUTE 27 AND ROUTE 16 [DESIGN ONLY] 81.8 II SWAP N/A 2025 Initiated $900,000 $0 $0 $0 $0 $0 $900,000
MARLBOROUGH- RECONSTRUCTION OF GRANGER BOULEVARD [DESIGN ONLY] 79.9 CS MWRC N/A 2025 Approved $1,215,000 $0 $0 $0 $0 $0 $1,215,000
CATA - CATA GLOUCESTER FACILITY MODERNIZATION TBD TT NSTF N/A 2025 N/A $1,293,000 $0 $0 $0 $0 $0 $1,293,000
ARLINGTON- BROADWAY COMPLETE STREETS DESIGN 80.1 CS ICC N/A 2025 Initiated $1,395,000 $0 $0 $0 $0 $0 $575,000
NORFOLK-WRENTHAM-WALPOLE- SHARED-USE PATH INSTALLATION (METACOMET GREENWAY) [DESIGN ONLY] 65 BP SWAP N/A 2025 Initiated $1,550,000 $0 $0 $0 $0 $0 $1,550,000
ARLINGTON- STRATTON SCHOOL IMPROVEMENTS (SRTS) N/A BP ICC 2025 2025 75% Received - R1 $1,625,250 $0 $0 $0 $0 $1,625,250 $5,000,000
CATA - VEHICLE REPLACEMENT (4 VEHICLES) TBD TT NSTF N/A 2025-26 N/A $1,710,000 $750,000 $0 $0 $0 $0 $2,460,000
MWRTA- BLANDIN HUB EQUITABLE REDESIGN INITIATIVE TBD TT MWRC N/A 2025-26 N/A $1,750,000 $750,000 $0 $0 $0 $0 $2,500,000
MWRTA- PROCUREMENT OF THREE 29 FOOT BUSES 52.2 TT MWRC N/A 2025 N/A $1,980,000 $0 $0 $0 $0 $0 $1,980,000
MBTA SYSTEMWIDE PEDAL AND PARK MODERNIZATION (ALEWIFE, ASHMONT, BRAINTREE, DAVIS SQUARE, FOREST HILLS, MALDEN CENTER, NUBIAN, OAK GROVE, ROUTE 128, SALEM, SOUTH STATION, WOLLASTON, WONDERLAND) N/A TT ICC, SSC, TRIC, NSTF  N/A 2025 5-10% design, advertising summer 2025, complete spring 2026 for furnishings and fall 2026 for control systems. $2,500,000 $0 $0 $0 $0 $0 $2,500,000
WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) & BEDFORD ROAD AND SOUTH BEDFORD STREET 52 II NSPC 2025 2025 25% Approved $3,438,311 $0 $0 $0 $0 $0 $3,438,311
CENTRAL SQUARE STATION ACCESSIBILITY IMPROVEMENTS N/A TT ICC N/A 2025 100% design, advertising September 2024. Complete May 2027. $5,000,000 $0 $0 $0 $0 $0 $5,000,000
MBTA NUBIAN SQUARE ACCESSIBILITY AND OPERATIONAL IMPROVEMENTS (BOSTON) N/A TT ICC N/A 2025 Approaching 15% design. Advertise January 2025 and complete May 2025. $5,000,000 $0 $0 $0 $0 $0 $5,000,000
MEDFORD- SHARED USE PATH CONNECTION AT THE ROUTE 28/WELLINGTON UNDERPASS N/A BP ICC 2025 2025 NTP issued (5/19/2021)
for FFY 2026 advertisement.
$5,509,294 $0 $0 $0 $0 $8,498,000 $1,625,250
RAIL TRANSFORMATION - EARLY ACTION ITEMS - READING STATION AND WILBUR INTERLOCKING N/A TT NSPC 2024 2024-25 N/A $6,000,000 $0 $0 $0 $0 $0 $20,000,000
COLUMBUS AVE BUS LANE PHASE II N/A TT ICC 2021, 2024 2021, 2024-25 N/A $7,500,000 $0 $0 $0 $0 $0 $11,750,000
PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 53 BP NSTF 2025 2025 25% Received
R1
$13,966,099 $0 $0 $0 $0 $0 $13,966,099
JACKSON SQUARE STATION ACCESSIBILITY IMPROVEMENTS N/A TT ICC 2024-25 2024-25 N/A $21,250,000 $0 $0 $0 $0 $0 $33,500,000
WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L. 59 CS NSPC 2025 2025 100% Received $37,452,645 $0 $0 $0 $0 $0 $37,452,645

 

 

Federal Fiscal Year 2025 (New) 2026 (New) 2027 (New) 2028 (New) 2029 (New) 2025-29 Total
Total Available Regional Highway Target Funds (2025-29 TIP): $128,427,689 $125,285,687 $155,132,142 $158,052,175 $161,030,608 $727,928,301
             
Draft Total Programmed Regional Highway Target Funds: $126,277,235 $124,569,057 $154,195,127 $157,830,836 $160,243,467 $723,115,723
Regional Highway Target Funds Remaining (Unprogrammed): $2,150,454 $716,630 $937,015 $221,339 $787,141 $4,812,578
Percent Unprogrammed 1.7% 0.6% 0.6% 0.1% 0.5% 0.7%

 

Projects in red text are identified as being high risk for staying on schedule based on information obtained at the February 2024 TIP readiness meeting.
Projects in orange text were identified as candidates to remain on schedule if near-term issue resolution occurs.
Red, bolded text on cost figures indicate a change in project funding, either an increase in cost and/or a delayed start year.
Black, bolded text on project names indicates an administrative line item.  These line items often set aside funding to be allocated in future TIP cycles.  
Indicates a project was recommended to move out to a later TIP year.
Indicates a project is proposed to added to the TIP.  

 

 

 

Abbreviations:

TIP investment programs: BP = Bicycle and Pedestrian. CC = Community Connections. CS = Complete Streets. II = Intersection Improvements. MI = Major Infrastructure. TT = Transit Transformation

Metropolitan Area Planning Council (MAPC) subregions: ICC = Inner Core Committee. MAGIC = Minuteman Advisory Group on Interlocal Coordination. MWRC = MetroWest Regional Collaborative. NSPC = North Suburban Planning Council. NSTF = North Shore Task Force. SSC = South Shore Coalition. SWAP = SouthWest Advisory Planning Committee. TRIC = Three Rivers Interlocal Council.

 

Other abbreviations:

CATA = Cape Ann Transportation Authority. C.L. = city line. CTPS = Central Transportation Planning Staff. DPH = design public hearing. FFY = federal fiscal year. MAPC = Metropolitan Area Planning Council. MART = Montachusett Regional Transit Authority. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority. MWRTA = MetroWest Regional Transit Authority. N/A = not applicable. NewMo = Newton in Motion. NTP = notice to proceed. PRC = MassDOT's Project Review Committee. PS&E = Plans, Specifications, and Estimates. R1 = resubmission. TBD = To Be Determined. TFPC = Total Federal Participating Cost. T.L. = town line. TRD = TIP Readiness Days.